» Read discussion on Hinds Pearl River Flood 06/13/11 The U.S. Army Corps of Engineers is demanding compliance with a tight conflict-of-interest policy before it will approve a Rankin-Hinds Pearl River Flood and Drainage Control District, aka the Levee Board , resolution.
11/08/10 The Rankin-Hinds Pearl River Flood and Drainage Control District Levee Board voted to elect Flowood Mayor Gary Rhoads chairman of the board and created a financing committee to fund flood control during today's meeting.
11/03/10 The Rankin-Hinds Pearl River Flood and Drainage Control District can take a lesson from Fort Worth, Texas, Waggoner Engineering owner Joe Waggoner said at the Oct. 27 Levee Board meeting.
10/20/10 The Rankin-Hinds Pearl River Flood and Drainage Control District Levee Board may be gearing up for a district expansion to pay for a proposed flood-control plan for the Pearl River.
10/11/10 Jackson oilman and "Two Lakes" developer John McGowan went before the Rankin-Hinds Pearl River Flood and Drainage Control District Levee Board this morning, demanding clarity over whether the board's one-lake plan would include expanded levees.
05/10/10 Rankin-Hinds Pearl River Flood and Drainage Control District Levee Board approved a resolution to re-engage the U.S. Army Corps of Engineers to move forward with a $205 million levee expansion for the Pearl River, but with the addition of a small lake ending just south of the LeFleur's Bluff Park and its adjoining Mayes Lake campground.
04/14/10 The Department of Archives and History has withdrawn its request for an opinion from Attorney General Jim Hood to determine if the Rankin-Hinds Pearl River Flood and Drainage Control District Levee Board should be designated as a state agency.
03/31/10 After four years of waiting, Mississippi Engineering Group Inc. finally delivered to the Rankin-Hinds Pearl River Flood and Drainage Control District Levee Board its 28-page draft of its economic-impact report on a Lower Lake Plan for flood control along the Pearl River.
03/15/10 An engineer urged the Rankin-Hinds Pearl River Flood and Drainage Control District Levee Board last week to press the U.S. Army Corps of Engineers to approve a lake plan to coincide with a Corps-preferred levee expansion the board approved in December. |